Taraz, Jambyl Province – Kazakhstan
Plant Capacity is 100.000 kW.
Yearly Energy Yield is 1.560 kWh/kWp.
Plant Life Cycle is 30 years.
Annual Electricity Production is 139.185 MWh.
Project Life Electricity Production is 4.175.554 MWh.
Ngabou, Touba – Senegal
Total Energy Production throught system’s lifetime period is 580 GWh.
System lifetime period is 25 years.
Annual photovoltaic degradation rate is 0.80%.
Energy price/kWh is 0.1052 EUR (69 CFA)